Energy

The producing and transporting side of energy: fields, plants, pipelines, corridors and the land they cross. Build with AI.

4live apps
7coming soon
8standards built in
PHMSA 49 CFR 192 / 195PHMSA PIPAAPI RP 1173CPUC Rule 21 / ICACPUC busbar mappingCEC land-use screensPPDM 3.9OSDU
Our work

4 apps, live today

Each one runs today on live data. Open it, or see how it works first.

49 CFR 195.452 · API RP 1187Pipeline Integrity Evidence Pack

Assembles a pipeline’s integrity evidence milepost by milepost, and colours each band by what is known: answered, checked and found nothing, never checked, or held only by the operator.

49 CFR §195.210 / §195.412 · §192.5 · PHMSA PIPARight-of-Way & Encroachment

Counts the published structures within 50 ft and 660 ft of a pipeline centerline, mile by mile, with the date of the imagery behind each count, and puts two dated aerials side by side so you can see where the ground has changed since.

CPUC Rule 21 · IOU ICA (Res. E-5440)Interconnection & DER Siting

Checks a shortlist of distributed-generation sites against the three utilities’ published hosting capacity, and says per site which feeder segments publish at or above the project size, how old each value is, and which sites need a study anyway.

CPUC busbar mapping methodology (2025-09-30) · CEC land-use screens (2026-27)Renewables Siting & Yield

Asks the CEC’s own land-use screen about every site on a solar or wind shortlist, and puts beside it the distance to transmission and the substations the CPUC portfolio maps new generation to, each figure dated and none printed against your site.

7 coming soon
Soon
Network Digital Twin Viewer

Published views of LiDAR-derived clearances, spans and attachments

Engineering survey practice
Soon
Facility & Terminal Map

Fields, plants, terminals and storage with status and capacity

CFIHOS 2.0 · ISO 15926 tag model
Soon
Transmission Corridor Planning

Route options against terrain, land, environment and community

Corridor routing practice
Soon
Concession & Block Register

Blocks, licences, partners, obligations and expiry

PPDM 3.9 · OSDU licence model
Soon
Emissions & Flare Monitoring

Flares, leaks and emissions events mapped over assets

Emissions reporting
Soon
Energy Demand & Load Growth

Where demand is growing and what the network must meet

Demand forecasting practice
Soon
HSE & Security of Assets

Incidents, exclusion zones and security posture across remote sites

ISO 45001 · site security